Sport

Five of a family injured in gas compressor machine blast

字号+ Author: Source:Game 2025-01-15 21:54:22 I want to comment(0)

ABBOTTABAD: Construction of a culvert on the main Karakoram Highway in front of the Ayub Teaching Ho

ABBOTTABAD: Construction of a culvert on the main Karakoram Highway in front of the Ayub Teaching Hospital Complex poses a serious threat of flooding to the health facility in the event of rains. This was pointed out in a letter the hospital’s director wrote to the National Highway Authority. The letter pointed out that construction of a culvert on the main Karakoram Highway near the gate no 5 of the hospital should be stopped till fixing of a faulty drain going along the highway. The letter said that due to ongoing construction of culvert there was possibility of flooding in torrential rains, and water might damage key buildings, including the mother and childcare hospital, cancer hospital, nursing college and paramedical school. Hospital’s director Dr Daud demanded of the NHA officials to first fix the faulty drainage system built along the KKH before constructing the culvert. He said whenever there was heavy rain floodwater damaged the hospital wards, especially emergency and cardiac unit, as well as the hostels.

1.This site adheres to industry standards, and any reposted articles will clearly indicate the author and source;

Related Articles
  • Govt stands firm after PTI seeks ‘rightful share’ in NA

    Govt stands firm after PTI seeks ‘rightful share’ in NA

    2025-01-15 20:52

  • Tens of thousands protest against Lebanon ‘bloodbath’ in Iran

    Tens of thousands protest against Lebanon ‘bloodbath’ in Iran

    2025-01-15 20:39

  • MNA Shandana Gulzar gets transit bail

    MNA Shandana Gulzar gets transit bail

    2025-01-15 20:17

  • Two children among three wounded after Israeli forces storm Nablus

    Two children among three wounded after Israeli forces storm Nablus

    2025-01-15 19:42

User Reviews