Health
Punjab seeks $329m Asian Infrastructure Investment Bank loan for Lahore water, sanitation overhaul
字号+ Author:Smart News Source:Business 2025-01-13 10:46:23 I want to comment(0)
ISLAMABAD: The Punjab government has submitted a $329 million project proposal to the Asian Infrastructure Investment Bank (AIIB) through the federal government. The initiative aims to ensure a sustainable supply of clean water, mitigate environmental degradation and strengthen the institutional capacity of Lahore’s Water and Sanitation Agency (Wasa) to improve service delivery. The project focuses on constructing surface water treatment infrastructure, upgrading Lahore’s water supply networks and building wastewater management systems to address issues of untreated sewage, urban flooding and dwindling groundwater resources. According to the project document, investment in safe water supply infrastructure will comprise the construction of a siphon to transport water in the Banbawala Ravi Bedian Depalpur (BRDB) Canal across Ravi River (the Ravi Siphon) and an intake structure at the BRDB canal; construction of potable water infrastructure, including a raw water channel from the intake structure, a surface water treatment plant, pumping stations, transmission and distribution networks; implementation of a Non-Revenue Water reduction programme through the rehabilitation of old and dilapidated network infrastructure; metering commercial and domestic connections; and improvements in the billing and collection system. Under the investment in wastewater and drainage management, the project will consist of the construction of two new trunk sewers and a new pumping station to safely transport wastewater for disposal and improve the urban environment and flooding by rehabilitating storm water drains. The construction of the trunk sewers will also allow the decommissioning of old pumping stations, which will reduce Lahore Wasa’s operating costs. The federal government has assured the AIIB that the Lahore agency will use the bank’s ESF to guide their environmental and social due diligence and preparation of relevant instruments. The agency has carried out preliminary due diligence, including three environmental and social impact studies of the project, in accordance with national policy and requirements.
1.This site adheres to industry standards, and any reposted articles will clearly indicate the author and source;
Related Articles
-
Ghazi University to establish Confucius Institute
2025-01-13 10:17
-
نشتار ہسپتال کے ڈائلسیس وارڈ میں لاپرواہی کی وجہ سے ایچ آئی وی کے کیسز کا تعلق قائم کرنے والا حقیقت تلاش کرنے والا ادارہ
2025-01-13 10:13
-
امریکی سپریم کورٹ نے گرافک اینٹی سموکنگ تصاویر کے خلاف اپیل مسترد کر دی
2025-01-13 09:57
-
2024ء میں پاکستان میں پولیو کے کیسز نصف صدی کے نشان تک پہنچ گئے۔
2025-01-13 09:53
User Reviews
Recommended Reads
Hot Information
- Belarusian delegation arrives, Lukashenko due today
- سندھ میں ایک اور کیس سامنے آنے سے پاکستان میں پولیو کے مریضوں کی تعداد 64 ہو گئی ہے۔
- حکومت نے 2024 کے لیے پولیو کے آخری مہم کا آغاز کیا ہے، کیونکہ کیسز میں اضافہ ہوا ہے۔
- ہم سردیوں میں زیادہ کیوں سوتے ہیں؟
- Schoolchildren’s performances enthral audience
- پاکستان میں پولیو کے کیسز کی تعداد 52 ہو گئی ہے۔
- ہم سردیوں میں زیادہ کیوں سوتے ہیں؟
- حکومت نے 2024 کے لیے پولیو کے آخری مہم کا آغاز کیا ہے، کیونکہ کیسز میں اضافہ ہوا ہے۔
- 12 couples tie knot at mass wedding ceremony in Taxila
Abont US
Follow our WhatasApp account to stay updated with the latest exciting content